Project Showcase

Lennar Homes Autumn Glen

An emergency road construction project providing quicker access into the community for emergency services. Follow our 6-phase process that brought this critical infrastructure to life.

70+
Pallets of Turfstone
4
Weeks Duration
2025
Project Year
Plainfield, Illinois

Project Timeline

Follow our comprehensive 5-phase approach for constructing the emergency access road providing critical infrastructure for emergency services in the Autumn Glen community.

1

Route Planning & Surveying

Comprehensive route assessment including topographical surveys and utility location. Designed optimal emergency access path through the community.

Topographical surveying
Utility location and marking
Emergency access route design
Route planning and surveying documentation for emergency access road
2

Site Clearing & Excavation

Cleared vegetation and obstacles along the emergency route. Excavated and graded the roadway to proper specifications for emergency vehicle access and drainage.

Vegetation and debris removal
Roadway excavation and grading
Drainage system preparation
Site preparation and construction work
3

Base Layer Installation

Installed crushed stone base and geotextile fabric for road stability. Compacted base materials to engineering specifications to support heavy emergency vehicles.

Geotextile fabric installation
Crushed stone base layer
Compaction and testing
Soil enhancement and preparation work
4

Turfstone Installation

Installed turfstone surface for the emergency access road. This permeable paving solution provides durable vehicle access while maintaining environmental sustainability and drainage.

Turfstone paver installation
Surface leveling and alignment
Soil filling and seeding
Lawn installation and sod work
5

Project Completion

Installed emergency access road. Completed project handover to Lennar for final inspections and emergency services coordination.

Emergency road construction
Road marking and striping
Project handover to Lennar
Final landscaping details and handover

Project Results

The Autumn Glen emergency access road project was completed successfully and on schedule. Here's what we accomplished for the community.

6500+
Linear Feet of Road
600+
Total Tons of Material
4
Weeks to Complete

Ready to Start Your Project?

Let us bring the same level of excellence to your next infrastructure project. Contact us today to discuss your construction needs.